SCAI with TSIT

Work order research cut from hours to minutes

Forward Deployed AI Engineers automated work order research inside an energy cooperative's operations, removing 70,000+ hours of manual effort a year.

Hours saved per year
70,000+
Annual savings
$1.5M
Research time per work order, from 1–2 hours
5 min
Challenge

Where it started

Field and back-office teams spent one to two hours researching each work order across disconnected systems before work could be scheduled, which capped throughput and made cost per order unpredictable.

How we ran it

  1. 01

    Embed with the operations team

    Forward Deployed AI Engineers worked inside the client's own workflow rather than from a separate delivery queue, mapping how work orders were actually researched and scheduled.

  2. 02

    Automate the research step

    The research path across systems was automated so the information needed to action a work order was assembled for the operator instead of gathered by hand.

  3. 03

    Leave the stack in place

    The automation stack stays with the client permanently after the engagement, so the saving is structural rather than dependent on continued consulting presence.

Run the same play on your estate.

Send the scope and the constraint you are working against, and we will route it to the practice that owns this work.